A conservatory replaced with a cantilevered extension

In Norwich, working alongside Calbrooke Builders, the old conservatory came down and a new extension went up, with floor-to-ceiling sliding doors, a timber roof on steel posts and a new 90 m² patio.

Place
Norwich
The job
Conservatory out, new extension, patio
Built with
Calbrooke Builders
Patio
90 m², with new fencing and gate
Finished extension with floor-to-ceiling sliding doors and a new porcelain patio
The finished extension and new patio

The job, in Wes’s words

The list from his post when the job was finished.

“With plenty of angles and detailed timber build-ups, this one has certainly kept us on our toes!”

Wes, on Facebook, during the build
  1. Demolition and removal of the existing conservatory
  2. Breaking out and removing all the old concrete and the existing patio area
  3. A new extension with floor-to-ceiling sliding patio doors
  4. A bespoke timber-frame roof on structural steel posts, with a cantilevered design
  5. Warm roof with Celotex insulation and a concealed gutter system
  6. A new 90 m² patio area
  7. New fencing and gate, and the surrounding areas tidied and finished
The programme

Stage by stage

Choose a stage to see it on site. The full photo record follows below.

Stage 1, Conservatory out: Demolition and removal of the existing conservatory.Stage 2, Concrete and patio broken out: All the old concrete and the existing patio broken out and taken away.Stage 3, Dig and footings: Ground dug out for the footings of the new extension.Stage 4, Steel posts and timber frame: A timber-frame roof on structural steel posts, with a cantilevered design.Stage 5, Warm roof and concealed gutter: Warm roof built up with Celotex insulation and a concealed gutter system.Stage 6, Sliders and cladding: Floor-to-ceiling sliding doors fitted, the posts and front timber-clad.Stage 7, 90 m² patio, fence and gate: A new 90 m² patio, new fencing and a gate, the surrounding areas tidied.Stage 8, Finished: A new room where the conservatory stood, open to the garden.

Stage 1 of 8: Conservatory out. Demolition and removal of the existing conservatory.

Every stage, photographed

The photos Wes posted from site, in order, at the size they were taken.

Stage 1 · The conservatory before it came out
Stage 1 · The conservatory before it came out
Stage 2 · Concrete and patio broken out
Stage 2 · Concrete and patio broken out
Stage 3 · Dug out for the footings
Stage 3 · Dug out for the footings
Stage 4 · Steel posts in
Stage 4 · Steel posts in
Stage 4 · Timber roof frame
Stage 4 · Timber roof frame
Stage 5 · Roof deck going on
Stage 5 · Roof deck going on
Stage 5 · Warm roof and gutter build-up
Stage 5 · Warm roof and gutter build-up
Stage 6 · Shell up, ready for glazing
Stage 6 · Shell up, ready for glazing
Stage 6 · Sliders in
Stage 6 · Sliders in
Stage 6 · Posts and front clad
Stage 6 · Posts and front clad
Stage 7 · New patio laid
Stage 7 · New patio laid
Stage 7 · New fencing
Stage 7 · New fencing
Stage 7 · New gate
Stage 7 · New gate
Stage 8 · Finished
Stage 8 · Finished
Stage 8 · Finished, from the patio
Stage 8 · Finished, from the patio

Thinking about replacing a conservatory?

Talk it through with Wes. He plans every stage and every trade it needs.